United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTRedonda Solar
Redonda Solar is a 253 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedDec 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0162
- Grid region
- ERCOT (Texas)
- Developer
- J&R Power DevCo, LLC
- Connection point (POI)
- tap 345kV 80307 Del Sol - 80225 Cenizo
- Technology
- Solar: 253 MW
- Total requested
- 253 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 25 January 2021
- Agreement signed
- 28 December 2021
- Proposed online date
- December 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem