United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Redonda Solar

Redonda Solar is a 253 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0162
Grid region
ERCOT (Texas)
Developer
J&R Power DevCo, LLC
Connection point (POI)
tap 345kV 80307 Del Sol - 80225 Cenizo
Technology
Solar: 253 MW
Total requested
253 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
25 January 2021
Agreement signed
28 December 2021
Proposed online date
December 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem