United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Redding Tech West

Redding Tech West is a 130 MW gas request withdrawn in the ERCOT interconnection queue, in Ector County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0320
Grid region
ERCOT (Texas)
Developer
Redding Tech West
Connection point (POI)
1250 Yukon 138kV
Location
Ector County, Texas
Technology
Gas: 130 MW
Total requested
130 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
31 August 2021
Proposed online date
July 2024
Withdrawn
October 2022

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.