SOLAR Β· ERCOT

Chiltepin Solar

Chiltepin Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0234
Grid region
ERCOT (Texas)
Developer
Chiltepin Solar-Storage, LLC
Connection point (POI)
6673 Musquiz 138kV
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 April 2021
Proposed online date
June 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem