United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Peeler Solar

Peeler Solar is a 210 MW solar request withdrawn in the ERCOT interconnection queue, in Atascosa County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2021 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0309
Grid region
ERCOT (Texas)
Developer
Peeler Solar, LLC
Connection point (POI)
5704 San Miguel 138kV
Location
Atascosa County, Texas
Technology
Solar: 210 MW
Total requested
210 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 June 2021
Proposed online date
October 2024
Withdrawn
March 2024

Location

Marker shows the centre of Atascosa County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Atascosa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem