United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Amsterdam Solar II

Amsterdam Solar II is a 510 MW solar request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0366
Grid region
ERCOT (Texas)
Developer
Cottonwood Bayou Solar II, LLC
Connection point (POI)
tap 345kV 43035 Oasis - 42500 Dow c27, c18
Location
Brazoria County, Texas
Technology
Solar: 510 MW
Total requested
510 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
11 August 2021
Proposed online date
February 2026
Withdrawn
January 2025

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem