United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTHollow Branch Creek Solar SLF
Hollow Branch Creek Solar SLF is a 712 MW solar request withdrawn in the ERCOT interconnection queue, in Leon County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2021 (completed)
- Withdrawn / abandonedJan 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0171
- Grid region
- ERCOT (Texas)
- Developer
- Hollow Branch Creek Solar LLC
- Connection point (POI)
- Jewett βΓΓ¬ Singleton 345 kV [PTI Bus # 3390 βΓΓ¬ 44645]
- Location
- Leon County, Texas
- Technology
- Solar: 712 MW
- Total requested
- 712 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 12 December 2021
- Proposed online date
- December 2025
- Withdrawn
- January 2024
Location
Marker shows the centre of Leon County; the queue data does not give exact sites.
Other requests in Leon County
- Hollow Branch Creek SolarSolar + storage Β· 460 MW Β· agreement signed
- Pecan Prairie NorthSolar Β· 321 MW Β· agreement signed
- Great Rock BESSBattery storage Β· 301 MW Β· agreement signed
- Leon Solar ParkSolar + storage Β· 210 MW Β· agreement signed
- Hollow Branch Creek StorageSolar + storage Β· 460 MW Β· in study
- Dempsey Solar SLFSolar + storage Β· 245 MW Β· in study
- Kahla StorageBattery storage Β· 201 MW Β· in study
- Pecan BESSBattery storage Β· 157 MW Β· in study
- Nickel Spruce SolarSolar Β· 150 MW Β· in study
- Pecan Prairie SouthSolar Β· 131 MW Β· in study
- HIP ESS ProjectOther Β· 60.0 MW Β· suspended
- Lazy J SolarSolar Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem