United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Lazy J Solar

Lazy J Solar is a 300 MW solar request withdrawn in the ERCOT interconnection queue, in Leon County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0225
Grid region
ERCOT (Texas)
Developer
ConnectGen Operating LLC
Connection point (POI)
47 Hilltop Lakes 138kV
Location
Leon County, Texas
Technology
Solar: 300 MW
Total requested
300 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 July 2019
Proposed online date
June 2021
Withdrawn
July 2020

Location

Marker shows the centre of Leon County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Leon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem