BATTERY STORAGE Β· ERCOT

BRP Charon BESS

BRP Charon BESS is a 411 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0360
Grid region
ERCOT (Texas)
Developer
BRP Charon BESS LLC
Connection point (POI)
Tap Smithers (#44650) and Bellaire (#47000) 345kV
Technology
Battery: 411 MW
Total requested
411 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
8 October 2021
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in