United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Flatland Solar Project

Flatland Solar Project is a 182 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0260
Grid region
ERCOT (Texas)
Developer
Flatland Solar Project, LLC
Connection point (POI)
11319 Scurry County 138kV
Technology
Solar: 182 MW
Total requested
182 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 May 2021
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem