πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

BRP Bachman BESS

BRP Bachman BESS is a 411 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0335
Grid region
ERCOT (Texas)
Developer
BRP Bachman BESS LLC
Connection point (POI)
44040 BAILEY 345kV_x000D_
Technology
Battery: 411 MW
Total requested
411 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 October 2021
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem