Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Arizona A1 Solar + storage |
3,645 MW | Withdrawn / abandoned |
| BlueWater Solar Solar + storage |
2,031 MW | Withdrawn / abandoned |
| Hyder Solar + storage |
1,648 MW | Withdrawn / abandoned |
| Icarus Solar Solar + storage |
1,435 MW | Withdrawn / abandoned |
| La Paz 2 Solar + storage |
1,034 MW | Withdrawn / abandoned |
| Adobe Flats Solar + storage |
1,024 MW | Withdrawn / abandoned |
| Pitchfork Energy Solar + storage |
1,024 MW | Withdrawn / abandoned |
| Wildcat Quartszite Solar |
1,000 MW | Withdrawn / abandoned |
| Jeep Wrangler Solar |
960 MW | Withdrawn / abandoned |
| Sun Streams 5 Solar + storage |
948 MW | Withdrawn / abandoned |
| La Paz Solar + storage |
943 MW | Withdrawn / abandoned |
| Primrose Hybrid Solar + storage |
912 MW | Withdrawn / abandoned |
| Harquahala Flats Solar + storage |
900 MW | Withdrawn / abandoned |
| La Posa Solar |
900 MW | Withdrawn / abandoned |
| Az Bighorn Solar |
900 MW | Withdrawn / abandoned |
| Ranegras Eagletail Solar |
900 MW | Withdrawn / abandoned |
| Palomas Solar Solar |
750 MW | Withdrawn / abandoned |
| CVH Power II Solar |
700 MW | Withdrawn / abandoned |
| Papago Solar + storage |
613 MW | Withdrawn / abandoned |
| South Point Energy Center Gas |
550 MW | Withdrawn / abandoned |
| Arizona Mohave Solar Solar |
521 MW | Withdrawn / abandoned |
| Harquahala Solar Solar |
519 MW | Withdrawn / abandoned |
| Pinecone Battery storage |
515 MW | Withdrawn / abandoned |
| Vulcan 2 Solar + storage |
505 MW | Withdrawn / abandoned |
| Sun Streams 4 Solar + storage |
450 MW | Withdrawn / abandoned |
| Winged Dove Storage Battery storage |
409 MW | Withdrawn / abandoned |
| Signal Peak Solar |
400 MW | Withdrawn / abandoned |
| Brenda Renewable Energy Complex Solar |
358 MW | Withdrawn / abandoned |
| Harquahala Sun Solar + storage |
313 MW | Withdrawn / abandoned |
| Century Solar Solar |
310 MW | Withdrawn / abandoned |
| Fort Mojave Solar Solar |
310 MW | Withdrawn / abandoned |
| Hyder Valley Solar Energy Solar |
300 MW | Withdrawn / abandoned |
| Hyder Solar |
300 MW | Withdrawn / abandoned |
| CVH Power I Solar |
300 MW | Withdrawn / abandoned |
| Titan Solar Gas |
300 MW | Withdrawn / abandoned |
| Arlington Valley Solar Energy II Solar |
250 MW | Withdrawn / abandoned |
| Caliente Solar Energy Solar |
250 MW | Withdrawn / abandoned |
| Hyder Solar Energy Project Solar |
250 MW | Withdrawn / abandoned |
| Quartzsite Solar Energy Solar |
250 MW | Withdrawn / abandoned |
| Parker Solar Energy Solar |
250 MW | Withdrawn / abandoned |
| Palmas C5 Solar |
238 MW | Withdrawn / abandoned |
| Palmas (Fka Hyder Solar) Solar |
238 MW | Withdrawn / abandoned |
| Red Wing Ranch Solar Solar |
205 MW | Withdrawn / abandoned |
| Blue Wing Ranch Solar Solar |
205 MW | Withdrawn / abandoned |
| Palomas Solar Project Solar |
200 MW | Withdrawn / abandoned |
| Sun Valley Energy Center-1 Solar |
200 MW | Withdrawn / abandoned |
| Darlington Balley Solar Energy 1 Solar + storage |
185 MW | Withdrawn / abandoned |
| Sun Streams Solar 3 Solar |
155 MW | Withdrawn / abandoned |
| Areva Solar Az I Solar |
150 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)