🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Harquahala Flats

Harquahala Flats is a 900 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1403
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Colorado River-Delaney 500kV
Location
Maricopa County, Arizona
Technology
Solar: 450 MW · Battery: 450 MW
Total requested
900 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
December 2022
Withdrawn
June 2020

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem