Papago

Papago is a 613 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1754
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Delaney Substation 500kV
Location
Maricopa County, Arizona
Technology
Solar: 307 MW Β· Battery: 306 MW
Total requested
613 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
October 2023
Withdrawn
March 2021

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem