Hyder

Hyder is a 300 MW solar request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
390
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
North Gila-Hassayampa 500 kV line
Location
Maricopa County, Arizona
Technology
Solar: 300 MW
Total requested
300 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 May 2008
Proposed online date
March 2012
Withdrawn
December 2009

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County