La Posa

La Posa is a 900 MW solar request withdrawn in the CAISO interconnection queue, in La Paz County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedMar 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
387
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Devers-Palo Verde 500 kV Line
Location
La Paz County, Arizona
Technology
Solar: 900 MW
Total requested
900 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 May 2008
Proposed online date
February 2015
Withdrawn
March 2011

Location

Marker shows the centre of La Paz County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in La Paz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem