BlueWater Solar

BlueWater Solar is a 2,031 MW solar + storage request withdrawn in the CAISO interconnection queue, in La Paz County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedMay 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2292
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Cielo Azul
Location
La Paz County, Arizona
Technology
Solar: 1,016 MW · Battery: 1,014 MW
Total requested
2,031 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
December 2028
Withdrawn
May 2025

Location

Marker shows the centre of La Paz County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in La Paz County