🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Socorro Peak Solar

Socorro Peak Solar is a 756 MW solar + storage request in interconnection study in the CAISO interconnection queue, in La Paz County, Arizona, connecting to DCRT.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2022
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Cielo Azul Substation 500 kV
Location
La Paz County, Arizona
Technology
Solar: 380 MW · Battery: 376 MW
Total requested
756 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
March 2029

Location

Marker shows the centre of La Paz County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in La Paz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem