United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Ranegras PVS

Ranegras PVS is a 1,438 MW solar + storage request in interconnection study in the CAISO interconnection queue, in La Paz County, Arizona, connecting to DCRT.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2025
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Colorado River-Delaney 500 kV line
Location
La Paz County, Arizona
Technology
Solar: 719 MW · Battery: 719 MW
Total requested
1,438 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
July 2029

Location

Marker shows the centre of La Paz County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in La Paz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem