Arizona Mohave Solar

Arizona Mohave Solar is a 521 MW solar request withdrawn in the CAISO interconnection queue, in Mohave County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1337
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
MOHAVE SWITCHYARD 500kV
Location
Mohave County, Arizona
Technology
Solar: 521 MW
Total requested
521 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2020
Withdrawn
March 2017

Location

Marker shows the centre of Mohave County; the queue data does not give exact sites.