BATTERY STORAGE · WEST

Battery storage project 2023-G16, Mohave County

Battery storage project 2023-G16, Mohave County is a 500 MW battery storage request in interconnection study in the West interconnection queue, in Mohave County, Arizona, connecting to WAPA Desert Southwest Region.

Queue statusIn planning
  1. PlanningQueued Dec 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2023-G16
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Desert Southwest Region
Connection point (POI)
Mead 230kV Substation
Location
Mohave County, Arizona
Technology
Battery: 500 MW
Total requested
500 MW
Queue status
Active
Entered queue
19 December 2023
Proposed online date
December 2028

Location

Marker shows the centre of Mohave County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Mohave County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem