United States › Grid › Interconnection queues › Arizona

ONSHORE WIND · WEST

Onshore wind project 2024-G5, Mohave County

Onshore wind project 2024-G5, Mohave County is a 300 MW onshore wind request in interconnection study in the West interconnection queue, in Mohave County, Arizona, connecting to WAPA Desert Southwest Region.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2024-G5
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Desert Southwest Region
Connection point (POI)
Mead – Peacock 345kV
Location
Mohave County, Arizona
Technology
Wind: 300 MW
Total requested
300 MW
Queue status
Active
Entered queue
15 August 2024
Proposed online date
December 2029

Location

Marker shows the centre of Mohave County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Mohave County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem