United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· CAISO

La Paz 2

La Paz 2 is a 1,034 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2021
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Cielo Azul Substation 500 kV
Location
Maricopa County, Arizona
Technology
Solar: 517 MW Β· Battery: 517 MW
Total requested
1,034 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
April 2028
Withdrawn
December 2022

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem