Fort Mojave Solar

Fort Mojave Solar is a 310 MW solar request withdrawn in the CAISO interconnection queue, in Mojave County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
593
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mohave Generating Station 500kV bus
Location
Mojave County, Arizona
Technology
Solar: 310 MW
Total requested
310 MW
Service type
Network resource (NRIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
December 2019
Withdrawn
May 2019

Location

Marker shows the centre of Mojave County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Mojave County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem