United States › Grid › Interconnection queues › Arizona
SOLAR · CAISOBrenda Renewable Energy Complex
Brenda Renewable Energy Complex is a 358 MW solar request withdrawn in the CAISO interconnection queue, in La Paz County, Arizona, connecting to DCRT.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedAug 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2024
- Grid region
- CAISO (California)
- Utility / transmission owner
- DCRT
- Connection point (POI)
- TWL Series Compensation Station 500 kV
- Location
- La Paz County, Arizona
- Technology
- Solar: 358 MW
- Total requested
- 358 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- December 2025
- Withdrawn
- August 2021
Location
Marker shows the centre of La Paz County; the queue data does not give exact sites.
Other requests in La Paz County
- Atlas ComplexSolar + storage · 4,357 MW · agreement signed
- Centennial FlatsSolar + storage · 767 MW · agreement signed
- Jove SolarSolar + storage · 4,133 MW · in study
- Bouse Solar And Storage PlantSolar + storage · 2,021 MW · in study
- Ranegras PVSSolar + storage · 1,438 MW · in study
- Socorro Peak SolarSolar + storage · 756 MW · in study
- Gas project 2023-G13, La Paz CountyGas · 453 MW · in study
- Solar + storage project 2023-G9, La Paz CountySolar + storage · 250 MW · in study
- Solar + storage project 2022-G1, La Paz CountySolar + storage · 250 MW · in study
- Solar + storage project 2023-G8, La Paz CountySolar + storage · 250 MW · in study
- BlueWater SolarSolar + storage · 2,031 MW · withdrawn
- Adobe FlatsSolar + storage · 1,024 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem