United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· CAISO

Caliente Solar Energy

Caliente Solar Energy is a 250 MW solar request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
436
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Palo Verde Devers #2 line
Location
Maricopa County, Arizona
Technology
Solar: 250 MW
Total requested
250 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2008
Proposed online date
July 2014
Withdrawn
November 2008

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem