United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Darlington Balley Solar Energy 1

Darlington Balley Solar Energy 1 is a 185 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1427
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa Switchyard 500kV
Location
Maricopa County, Arizona
Technology
Solar: 125 MW · Battery: 60.0 MW
Total requested
185 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
April 2024
Withdrawn
March 2020

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem