United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· CAISO

Hyder

Hyder is a 1,648 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2172
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hoodoo Wash - Hassayampa 500 kV Line
Location
Maricopa County, Arizona
Technology
Solar: 824 MW Β· Battery: 824 MW
Total requested
1,648 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
June 2035
Withdrawn
December 2024

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem