SOLAR Β· CAISO

Century Solar

Century Solar is a 310 MW solar request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1296
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Delaney-Colorado River Line 500kV
Location
Maricopa County, Arizona
Technology
Solar: 310 MW
Total requested
310 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2021
Withdrawn
March 2017

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County