🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Arizona

SOLAR · CAISO

Arlington Valley Solar Energy II

Arlington Valley Solar Energy II is a 250 MW solar request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
673
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa - N. Gila 500 kV line
Location
Maricopa County, Arizona
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
May 2015
Withdrawn
March 2012

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem