United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Primrose Hybrid

Primrose Hybrid is a 912 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2028
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Delaney Substation 500 kV
Location
Maricopa County, Arizona
Technology
Solar: 459 MW · Battery: 453 MW
Total requested
912 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
June 2025
Withdrawn
August 2021

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem