United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· CAISO

Parker Solar Energy

Parker Solar Energy is a 250 MW solar request withdrawn in the CAISO interconnection queue, in La Paz County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
453
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mohave Switchyard
Location
La Paz County, Arizona
Technology
Solar: 250 MW
Total requested
250 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 June 2008
Proposed online date
July 2014
Withdrawn
November 2008

Location

Marker shows the centre of La Paz County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in La Paz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem