United States βΊ Grid βΊ Interconnection queues βΊ Arizona
SOLAR Β· CAISOParker Solar Energy
Parker Solar Energy is a 250 MW solar request withdrawn in the CAISO interconnection queue, in La Paz County, Arizona, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 453
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- Mohave Switchyard
- Location
- La Paz County, Arizona
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 2 June 2008
- Proposed online date
- July 2014
- Withdrawn
- November 2008
Location
Marker shows the centre of La Paz County; the queue data does not give exact sites.
Other requests in La Paz County
- Atlas ComplexSolar + storage Β· 4,357 MW Β· agreement signed
- Centennial FlatsSolar + storage Β· 767 MW Β· agreement signed
- Jove SolarSolar + storage Β· 4,133 MW Β· in study
- Bouse Solar And Storage PlantSolar + storage Β· 2,021 MW Β· in study
- Ranegras PVSSolar + storage Β· 1,438 MW Β· in study
- Socorro Peak SolarSolar + storage Β· 756 MW Β· in study
- Gas project 2023-G13, La Paz CountyGas Β· 453 MW Β· in study
- Solar + storage project 2023-G9, La Paz CountySolar + storage Β· 250 MW Β· in study
- Solar + storage project 2022-G1, La Paz CountySolar + storage Β· 250 MW Β· in study
- Solar + storage project 2023-G8, La Paz CountySolar + storage Β· 250 MW Β· in study
- BlueWater SolarSolar + storage Β· 2,031 MW Β· withdrawn
- Adobe FlatsSolar + storage Β· 1,024 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem