United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· CAISO

Palmas C5

Palmas C5 is a 238 MW solar request withdrawn in the CAISO interconnection queue, in Yuma County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedJun 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
940
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa-North Gila 500kV Line
Location
Yuma County, Arizona
Technology
Solar: 238 MW
Total requested
238 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
July 2014
Withdrawn
June 2012

Location

Marker shows the centre of Yuma County; the queue data does not give exact sites.