United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Remy

Remy is a 617 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Yuma County, Arizona, connecting to SDGE.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2154
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hoodoo Wash Switchyard 500 kV
Location
Yuma County, Arizona
Technology
Solar: 308 MW · Battery: 309 MW
Total requested
617 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
June 2029

Location

Marker shows the centre of Yuma County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Yuma County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem