Vulcan 2

Vulcan 2 is a 505 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1826
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa Switchyard Common Bus 500kV
Location
Maricopa County, Arizona
Technology
Solar: 253 MW Β· Battery: 253 MW
Total requested
505 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
September 2024
Withdrawn
July 2020

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem