United States › Grid › Interconnection queues › Arizona

SOLAR + STORAGE · CAISO

Pitchfork Energy

Pitchfork Energy is a 1,024 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to DCRT.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1530
Grid region
CAISO (California)
Utility / transmission owner
DCRT
Connection point (POI)
Delaney Substation 500kV
Location
Maricopa County, Arizona
Technology
Solar: 514 MW · Battery: 510 MW
Total requested
1,024 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2024
Withdrawn
March 2019

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem