Blue Wing Ranch Solar

Blue Wing Ranch Solar is a 205 MW solar request withdrawn in the CAISO interconnection queue, in Yuma County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedApr 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1285
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hoodoo Wash Switchyard 500 kV
Location
Yuma County, Arizona
Technology
Solar: 205 MW
Total requested
205 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2021
Withdrawn
April 2017

Location

Marker shows the centre of Yuma County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Yuma County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem