United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· CAISO

CVH Power II

CVH Power II is a 700 MW solar request withdrawn in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedAug 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
808
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Harquahala Substation 500kV
Location
Maricopa County, Arizona
Technology
Solar: 700 MW
Total requested
700 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
September 2014
Withdrawn
August 2011

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem