United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· CAISO

Icarus Solar

Icarus Solar is a 1,435 MW solar + storage request withdrawn in the CAISO interconnection queue, in Mohave County, Arizona, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2310
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
MOHAVE 500 kV
Location
Mohave County, Arizona
Technology
Solar: 718 MW Β· Battery: 716 MW
Total requested
1,435 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
December 2032
Withdrawn
December 2025

Location

Marker shows the centre of Mohave County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Mohave County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem