Palmas (Fka Hyder Solar)

Palmas (Fka Hyder Solar) is a 238 MW solar request withdrawn in the CAISO interconnection queue, in Yuma County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedSep 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643AQ
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa-North Gila 500kV line
Location
Yuma County, Arizona
Technology
Solar: 238 MW
Total requested
238 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
June 2013
Withdrawn
September 2011

Location

Marker shows the centre of Yuma County; the queue data does not give exact sites.