United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· CAISO

Palomas Solar

Palomas Solar is a 750 MW solar request withdrawn in the CAISO interconnection queue, in Yuma County, Arizona, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2009 (completed)
  2. Withdrawn / abandonedSep 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
501
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hassayampa-North Gila 500kV switching station
Location
Yuma County, Arizona
Technology
Solar: 750 MW
Total requested
750 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2009
Proposed online date
June 2015
Withdrawn
September 2010

Location

Marker shows the centre of Yuma County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Yuma County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem