Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lumina Solar Solar · IP Lumina, LLC |
313 MW | Withdrawn / abandoned |
| Fletcher BESS Battery storage · Archer Energy Center, LLC |
310 MW | Withdrawn / abandoned |
| Barbers Hill BESS Battery storage · Black Mountain Energy Storage II |
308 MW | Withdrawn / abandoned |
| Easter Wind Onshore wind · TriGlobal |
308 MW | Withdrawn / abandoned |
| Valhalla Solar Solar · Industrial Papa Project LLC |
307 MW | Withdrawn / abandoned |
| Box Canyon Energy Storage Other · Box Canyon Energy Storage Project, LLC |
306 MW | Withdrawn / abandoned |
| Goose Foot Energy Storage Battery storage · Goose Foot Energy Storage Project, LLC |
306 MW | Withdrawn / abandoned |
| Tyler BESS Battery storage · SMT Tyler LLC |
305 MW | Withdrawn / abandoned |
| Frio Flat Wind Onshore wind · Phoenix Wind, LLC |
305 MW | Withdrawn / abandoned |
| Voyager Solar Solar · EDF Renewables Development, Inc. |
304 MW | Withdrawn / abandoned |
| BRP Parana BESS Battery storage · BRP Parana BESS |
304 MW | Withdrawn / abandoned |
| Amethyst Storage Other · Riggs Energy Storage LLC |
304 MW | Withdrawn / abandoned |
| Wildrose Wind Onshore wind · S Power |
303 MW | Withdrawn / abandoned |
| Great Dane Wind Onshore wind · Seventus |
303 MW | Withdrawn / abandoned |
| Stump Tail BESS Other · Moccasin Pointe Grid, LLC |
302 MW | Withdrawn / abandoned |
| Soleil Storage Battery storage · Soleil Solar, LLC |
302 MW | Withdrawn / abandoned |
| Mariette Solar Solar · Mariette Solar LLC |
301 MW | Withdrawn / abandoned |
| Fox Run Energy Storage Other · Fox Run Energy Project, LLC |
301 MW | Withdrawn / abandoned |
| Pease River Wind Onshore wind · Eon |
301 MW | Withdrawn / abandoned |
| BRP Pobeda BESS Battery storage · BRP Pobeda BESS LLC |
301 MW | Withdrawn / abandoned |
| Harden BESS Battery storage · BRP Blue Topaz 14, LLC |
301 MW | Withdrawn / abandoned |
| Blossomheath BESS Battery storage · Taurbeng LLC |
301 MW | Withdrawn / abandoned |
| Brazoria Texas Peakers Gas · LS Power Associates, LP |
300 MW | Withdrawn / abandoned |
| Blanco Canyon Wind Onshore wind · Blanco Canyon Wind Development |
300 MW | Withdrawn / abandoned |
| Galveston Offshore Wind Offshore wind · Galveston - Offshore Wind, LLC |
300 MW | Withdrawn / abandoned |
| Lazarus Solar Solar · Lendlease Energy Development |
300 MW | Withdrawn / abandoned |
| Route66 Wind Onshore wind · Route 66 LLC |
300 MW | Withdrawn / abandoned |
| McAdoo Project Onshore wind · Invenergy Wind |
300 MW | Withdrawn / abandoned |
| Fort McKavett Wind Onshore wind · Nextera |
300 MW | Withdrawn / abandoned |
| Plateau Solar Solar · Innovative Solar 206, LLC |
300 MW | Withdrawn / abandoned |
| Stone Ranch Wind Onshore wind · Iberdrola Renewables |
300 MW | Withdrawn / abandoned |
| Lazy J Solar Solar · ConnectGen Operating LLC |
300 MW | Withdrawn / abandoned |
| MykawaAlta Gas · Alta Power LLC |
300 MW | Withdrawn / abandoned |
| Nacogdoches CC Generating Facility Gas · Nacogdoches Power, LLC |
300 MW | Withdrawn / abandoned |
| Windwood Wind Onshore wind · Lincoln Clean |
300 MW | Withdrawn / abandoned |
| Reed Road Project Gas · LS Power Associates, LP |
300 MW | Withdrawn / abandoned |
| Tiger Wind Onshore wind · Nextera |
300 MW | Withdrawn / abandoned |
| Pistol Hill Energy Center Onshore wind · Invenergy |
300 MW | Withdrawn / abandoned |
| Karankawa Wind Farm Onshore wind · Acciona Wind Energy USA, LLC |
300 MW | Withdrawn / abandoned |
| Saturn 1 Wind Onshore wind · Saturn 1 wind |
300 MW | Withdrawn / abandoned |
| Callisto Solar · Intersect Power |
300 MW | Withdrawn / abandoned |
| Welder Solar Solar · Welder Solar, LLC |
300 MW | Withdrawn / abandoned |
| Comanche Mesa Onshore wind · Pioneer Green Energy, LLC |
300 MW | Withdrawn / abandoned |
| Zapata I W Onshore wind · Nextera |
300 MW | Withdrawn / abandoned |
| Sterling Energy Center Onshore wind · Invenergy |
300 MW | Withdrawn / abandoned |
| AltaRanch Gas · Alta Power LLC |
300 MW | Withdrawn / abandoned |
| Milky Way Solar Solar · Aurora Solar LLC |
300 MW | Withdrawn / abandoned |
| Huckabay Hills Windfarm Onshore wind · FPL Energy, LLC |
300 MW | Withdrawn / abandoned |
| Mitchell I Windpark 1 Onshore wind · Redbank, LLC |
300 MW | Withdrawn / abandoned |
| Pradera Solar Solar · Pradera Solar, LLC |
300 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)