Tiger Wind

Tiger Wind is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Taylor County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0153
Grid region
ERCOT (Texas)
Developer
Nextera
Connection point (POI)
68000 West Shackelford 345kV
Location
Taylor County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 October 2018
Proposed online date
December 2022
Withdrawn
March 2021

Location

Marker shows the centre of Taylor County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Taylor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem