United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTWelder Solar
Welder Solar is a 300 MW solar request withdrawn in the ERCOT interconnection queue, in Bee County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0356
- Grid region
- ERCOT (Texas)
- Developer
- Welder Solar, LLC
- Connection point (POI)
- tap 345kV 8624 Grissom - 8455 Lon Hill
- Location
- Bee County, Texas
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 June 2019
- Proposed online date
- October 2024
- Withdrawn
- March 2024
Location
Marker shows the centre of Bee County; the queue data does not give exact sites.
Other requests in Bee County
- Argenta SolarSolar + storage Β· 310 MW Β· agreement signed
- Foxtrot WindOnshore wind Β· 268 MW Β· agreement signed
- Abeja Solar FarmSolar Β· 201 MW Β· agreement signed
- Argenta StorageSolar + storage Β· 192 MW Β· agreement signed
- Honeycomb Solar SLFSolar + storage Β· 61.4 MW Β· agreement signed
- BumbleBee SolarSolar Β· 212 MW Β· in study
- Spinner Energy StorageBattery storage Β· 126 MW Β· in study
- Myers SolarSolar + storage Β· 102 MW Β· in study
- Myers StorageSolar + storage Β· 76.0 MW Β· in study
- Orchard Ray BESSBattery storage Β· 51.9 MW Β· in study
- Cuhullin WindOnshore wind Β· 310 MW Β· suspended
- Sparta SolarSolar Β· 252 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem