BATTERY STORAGE Β· ERCOTSoleil Storage
Soleil Storage is a 302 MW battery storage request withdrawn in the ERCOT interconnection queue, in Clay County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0098
- Grid region
- ERCOT (Texas)
- Developer
- Soleil Solar, LLC
- Connection point (POI)
- Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2
- Location
- Clay County, Texas
- Technology
- Battery: 302 MW
- Total requested
- 302 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 1 September 2022
- Proposed online date
- October 2027
- Withdrawn
- April 2025
Location
Marker shows the centre of Clay County; the queue data does not give exact sites.
Other requests in Clay County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem