United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTBluegrove Wind
Bluegrove Wind is a 100 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Clay County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0044
- Grid region
- ERCOT (Texas)
- Developer
- Innergex
- Connection point (POI)
- tap 138kV 1468 LKAROWHD - 1470 NEWPRT_P
- Location
- Clay County, Texas
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 18 October 2016
- Proposed online date
- December 2019
- Withdrawn
- January 2019
Location
Marker shows the centre of Clay County; the queue data does not give exact sites.
Other requests in Clay County
- Soleil SolarSolar Β· 452 MW Β· agreement signed
- Hiru SolarSolar + storage Β· 604 MW Β· in study
- Hiru StorageSolar + storage Β· 504 MW Β· in study
- Clay County Yang StorageBattery storage Β· 308 MW Β· in study
- Lutum WindOnshore wind Β· 242 MW Β· in study
- Soleil StorageBattery storage Β· 302 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem