ONSHORE WIND Β· ERCOT

Bluegrove Wind

Bluegrove Wind is a 100 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Clay County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0044
Grid region
ERCOT (Texas)
Developer
Innergex
Connection point (POI)
tap 138kV 1468 LKAROWHD - 1470 NEWPRT_P
Location
Clay County, Texas
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 October 2016
Proposed online date
December 2019
Withdrawn
January 2019

Location

Marker shows the centre of Clay County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Clay County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem