United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Fort McKavett Wind

Fort McKavett Wind is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Menard County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0154
Grid region
ERCOT (Texas)
Developer
Nextera
Connection point (POI)
loop on 60618 Edison - 7046 Kendal 345kV
Location
Menard County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 August 2018
Proposed online date
December 2020
Withdrawn
March 2019

Location

Marker shows the centre of Menard County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Menard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem