ONSHORE WIND Β· ERCOT

Great Dane Wind

Great Dane Wind is a 303 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Wharton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0160
Grid region
ERCOT (Texas)
Developer
Seventus
Connection point (POI)
5546 Danevang 138kV
Location
Wharton County, Texas
Technology
Wind: 303 MW
Total requested
303 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 January 2018
Proposed online date
March 2020
Withdrawn
March 2019

Location

Marker shows the centre of Wharton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wharton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem