ONSHORE WIND Β· ERCOTZapata I W
Zapata I W is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Jim Hogg County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0105
- Grid region
- ERCOT (Texas)
- Developer
- Nextera
- Connection point (POI)
- 8299 Zapata 138kV
- Location
- Jim Hogg County, Texas
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 29 April 2015
- Proposed online date
- December 2019
- Withdrawn
- March 2019
Location
Marker shows the centre of Jim Hogg County; the queue data does not give exact sites.
Other requests in Jim Hogg County
- Mirando Valley WindOnshore wind Β· 479 MW Β· in study
- Viento Bravo WindOnshore wind Β· 367 MW Β· in study
- Ciervo WindOnshore wind Β· 302 MW Β· in study
- Barranca Wind 1Onshore wind Β· 301 MW Β· in study
- Barranca Wind 2Onshore wind Β· 299 MW Β· in study
- Bell Song Solar 2Solar Β· 168 MW Β· in study
- Bell Song Solar 3Solar Β· 168 MW Β· in study
- Bell Song SolarSolar Β· 168 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem