United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Easter Wind

Easter Wind is a 308 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Castro County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2013 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. ConsentedJun 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0063
Grid region
ERCOT (Texas)
Developer
TriGlobal
Connection point (POI)
79502 Windmill 345kV
Location
Castro County, Texas
Technology
Wind: 308 MW
Total requested
308 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
17 December 2013
Agreement signed
1 June 2018
Proposed online date
December 2021
Withdrawn
October 2019

Location

Marker shows the centre of Castro County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Castro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem