🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas — page 33

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,094476.4 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,094 requests · page 33 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Fudge Ranch BESS
Battery storage · Crandall BESS LLC
104 MWIn study Kaufman, TXERCOT Apr 2024target 2027
Rockpile Storage
Battery storage · Rockpile Storage, LLC
104 MWIn study Frio, TXERCOT Apr 2025target 2029
Yellow Leaf BESS
Solar + storage · Lightsource Renewable Energy Development LLC
104 MWIn study Kaufman, TXERCOT Apr 2025target 2028
Aggie Solar Project SLF
Solar + storage · reNRG TX 8 LLC
104 MWIn study Reeves, TXERCOT Feb 2024target 2027
Anawa La BESS
Solar + storage · Anawa La Solar LLC
104 MWIn study Hidalgo, TXERCOT Mar 2024target 2027
Piedra BESS
Solar + storage · Piedra Solar, LLC
104 MWAgreement signed Freestone, TXERCOT Sep 2022target 2026
Bronze Quinta Storage
Battery storage · KCE TX 28, LLC
104 MWIn study Hidalgo, TXERCOT Jan 2022target 2028
Diamond Cowboy Storage
Battery storage · Diamond B Storage, LLC
104 MWIn study San Patricio, TXERCOT Apr 2024target 2028
Post Trail Energy
Battery storage · Post Trail Energy, LLC
104 MWIn study Matagorda, TXERCOT Sep 2024target 2028
Gatsby Energy Storage
Battery storage · Gatsby Energy Storage LLC
103 MWIn study Pecos, TXERCOT Feb 2024target 2027
Three Ranches BESS
Solar + storage · Three Ranches Energy LLC
103 MWIn study Brewster, TXERCOT Aug 2025target 2027
Rio Vista Storage
Solar + storage · Rio Vista Storage, LLC
103 MWIn study Pecos, TXERCOT Jun 2025target 2028
Shallow Valley Storage
Battery storage · Shallow Valley Storage, LLC
103 MWIn study Ward, TXERCOT Jul 2024target 2028
Pequin Energy Storage
Battery storage · Pequin Energy Storage, LLC
103 MWIn study Brazoria, TXERCOT Jan 2021target 2027
Hyacinth Storage
Battery storage · Hyacinth Storage, LLC
103 MWIn study Harris, TXERCOT Jul 2021target 2030
Atticus Energy Storage
Battery storage · Atticus Energy Storage
103 MWIn study Sutton, TXERCOT Mar 2024target 2027
Appaloosa Run BESS
Battery storage · APPALOOSA RUN STORAGE, LLC
103 MWIn study Upton, TXERCOT Mar 2022target 2026
Evans Creek Energy Storage
Battery storage · Evans Creek Energy Storage LLC
103 MWIn study Val Verde, TXERCOT Oct 2023target 2028
Black Bear Solar
Solar + storage · ESCONDIDO DRAW RESOURCES, LLC
103 MWIn study Crockett, TXERCOT Dec 2023target 2028
Massey Storage
Battery storage · Massey Storage, LLC
103 MWIn study Harris, TXERCOT Jul 2024target 2028
Wisdom BESS SLF
Solar + storage · Wisdom Green Energy LLC
103 MWIn study Pecos, TXERCOT Feb 2025target 2027
Third Coast BESS
Battery storage · Third Coast BESS LLC
103 MWAgreement signed Jackson, TXERCOT Aug 2021target 2027
Louisa Energy Storage
Battery storage · VESI 49 LLC
103 MWAgreement signed Bexar, TXERCOT Nov 2021target 2029
Seven Flags BESS
Battery storage · Seven Flags BESS LLC
103 MWAgreement signed Webb, TXERCOT Sep 2021target 2026
Firebird BESS
Battery storage · TX BESS 6, LLC
103 MWIn study Ector, TXERCOT Nov 2023target 2028
Tierra Seca BESS
Battery storage · Tierra Seca BESS LLC
103 MWAgreement signed Val Verde, TXERCOT Aug 2021target 2026
Millennium Energy Storage
Battery storage
103 MWPaused / redesign Martin, TXERCOT May 2023
Bexar ESS
Battery storage · Bexar ESS LLC
103 MWAgreement signed Bexar, TXERCOT Sep 2021target 2025
Madrone Energy Storage
Battery storage
103 MWPaused / redesign Comal, TXERCOT Jan 2021
Estonian Storage
Other · 249RD 8ME
103 MWPaused / redesign Delta, TXERCOT Jan 2020target 2022
Roost Energy Storage
Battery storage · Bluff Creek Energy Storage LLC
102 MWIn study Scurry, TXERCOT Jan 2023target 2027
Holstein 2 Energy Storage
Solar + storage · 229HD 8me LLC
102 MWIn study Nolan, TXERCOT Aug 2019target 2027
Amador Storage
Battery storage · BT Amador Storage, LLC
102 MWAgreement signed Van Zandt, TXERCOT Nov 2022target 2026
Big Five Storage
Battery storage · TX BESS 3 LLC
102 MWIn study Hidalgo, TXERCOT May 2023target 2028
Prairie Horizon Energy Storage 4
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Blackland Prairie 1 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 6 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
watermelon 2 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Edgewood BESS 2
Battery storage · Tempus Power management LLC
102 MWIn study Van Zandt, TXERCOT Jan 2025target 2028
Pioneer Path Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 1 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
watermelon 3 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 2
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 4
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 4 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Blackland Prairie 2 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 5 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Pioneer Path Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Page 33 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)